Monday, March 30, 2009

multi-bay battery chargers, ceiling power, or multiple batteries?

Hello all,
I am looking for advice from anyone who has successfully solved the power
strip dilemma in a 1:1 program. Our teachers are increasingly frustrated
with power strips running across the floor and I am considering three
options:

1. Investing in a multi-bay battery charging system and extra batteries and
allowing no student chargers at school
2. Supplying each student with two batteries
3. Hanging "power poles" from the ceiling

Thanks for any help,
Brett

Brett DiMatteo
Director of Technology
American School of Warsaw
http://www.asw.waw.pl/